NATURAL GAS STORAGE FACILITY PROJECT
Project Name
Location
İSTANBUL / SİLİVRİ
Date
2021 - 2022
Duration
IN PROGRESS
Scope
Fire Water Tank , HC Condensate Tank, Water Condensate Tank, Drinking Water Tank
Service
Design & Engineering, Fabrication, Procurement, Erection, Testing
![7](https://dehatech.fr/wp-content/uploads/2022/05/7.jpeg)
![8 8](https://dehatech.fr/wp-content/uploads/2022/05/8.jpeg)
![9 9](https://dehatech.fr/wp-content/uploads/2022/05/9.jpeg)
![10](https://dehatech.fr/wp-content/uploads/2022/05/10.jpg)
![12](https://dehatech.fr/wp-content/uploads/2022/05/12.jpg)
![1](https://dehatech.fr/wp-content/uploads/2022/05/1.jpeg)
![2 2](https://dehatech.fr/wp-content/uploads/2022/05/2.jpeg)
![3](https://dehatech.fr/wp-content/uploads/2022/05/3.jpeg)
![4](https://dehatech.fr/wp-content/uploads/2022/05/4.jpg)
![5 5](https://dehatech.fr/wp-content/uploads/2022/05/5-555x416.jpg)
![13](https://dehatech.fr/wp-content/uploads/2022/05/13.jpg)